實驗代號 Experiment ID | 實驗名稱 | Experiment Name | 地點 Site | 設施 Facility | 實驗類型 Type | 試體材料 Material | 說明 | Description |
| P2-C | 牛鬥橋現地實驗-P2橋墩 | In-Situ Test of Niu-Dou Bridge, Column P2 | NCREE | Field | Cyclical loading test | RC | P2橋柱位屬河道高灘地區域,無基礎沖刷情況,規劃依84年耐震設計規範製作人造地震,先進行擬動態試驗後,再施加單一循環側推試驗。擬動態實驗輸入用之地震歷時記錄,考量橋址位於宜蘭縣,地震事件選用民國91年3月31日地震(規模6.8)於三星鄉牛鬥地區所紀錄之資料,強震站測站編碼為ILA025,震央距離84.2km。依據現行民國98年6月修訂之公路橋梁耐震設計規範,第二章之震區基本資料與第三章3.4.1節地震歷時之規定製作人造地震歷時。由於實驗時橋柱受力方向與測站所收錄之東-西、南北向歷時約呈45度夾角,故將原始紀錄之東西向與南北向地震歷時,依照45度夾角分量重新組合成一組新的地震歷時,再進行人造地震製作,命名為at-45deg。因原始紀錄時間較長,考量現場作業時間與系統穩定性,實驗中僅選擇主要震動區段40秒記錄作為輸入地表加速度。 | This study employed a cyclic loading experiment as the primary test for Columns P3 and P4, and the loading protocol was conducted at drift ratios of 0.25%, 0.375%, 0.5%, 0.75%, 1.0%, 1.5%, 2.0%, and 3.0%. Two cycles were performed at each drift angle. Considering the limitations to the stroke of the actuator, cyclic loading was pulled to 3% drift before it was further pushed to a drift of 5%. Prior to the single-cycle pushover test, a pseudo-dynamic test was conducted on Column P2. An artifi cial time-history compatible with the design response spectrum according to the seismic design specifi cation for highway bridges (MOTC, 2009) was developed. Because the Niu-Dou Bridge was situated in Yilan County, the data pertaining to the earthquake event on March 31, 2002 (Richter scale of 6.8) in the Niu-Dou region of Sansing Township were used in this study. The design parameters were Ss D = 0.8 and S1 D = 0.45. The ground motion record was selected from station ILA025. In the experiment, the original time history for east-west (PGA = 90.74 Gal) and southnorth (PGA = 118.62 Gal) directions was assembled into a new ground acceleration. Subsequently, an artifi cial time history compatible with the design response spectrum was created. Considering the total duration of the original record was relatively long, and the time limitation of the on-site operation and system stability, only the main 40 s vibration record was adopted as the input ground acceleration for the experiment. |
| P2-PD | 牛鬥橋現地實驗-P2橋墩 | In-Situ Test of Niu-Dou Bridge, Column P2 | NCREE | Field | Pseudo-dynamic test | RC | P2橋柱位屬河道高灘地區域,無基礎沖刷情況,規劃依84年耐震設計規範製作人造地震,先進行擬動態試驗後,再施加單一循環側推試驗。擬動態實驗輸入用之地震歷時記錄,考量橋址位於宜蘭縣,地震事件選用民國91年3月31日地震(規模6.8)於三星鄉牛鬥地區所紀錄之資料,強震站測站編碼為ILA025,震央距離84.2km。依據現行民國98年6月修訂之公路橋梁耐震設計規範,第二章之震區基本資料與第三章3.4.1節地震歷時之規定製作人造地震歷時。由於實驗時橋柱受力方向與測站所收錄之東-西、南北向歷時約呈45度夾角,故將原始紀錄之東西向與南北向地震歷時,依照45度夾角分量重新組合成一組新的地震歷時,再進行人造地震製作,命名為at-45deg。因原始紀錄時間較長,考量現場作業時間與系統穩定性,實驗中僅選擇主要震動區段40秒記錄作為輸入地表加速度。 | This study employed a cyclic loading experiment as the primary test for Columns P3 and P4, and the loading protocol was conducted at drift ratios of 0.25%, 0.375%, 0.5%, 0.75%, 1.0%, 1.5%, 2.0%, and 3.0%. Two cycles were performed at each drift angle. Considering the limitations to the stroke of the actuator, cyclic loading was pulled to 3% drift before it was further pushed to a drift of 5%. Prior to the single-cycle pushover test, a pseudo-dynamic test was conducted on Column P2. An artifi cial time-history compatible with the design response spectrum according to the seismic design specifi cation for highway bridges (MOTC, 2009) was developed. Because the Niu-Dou Bridge was situated in Yilan County, the data pertaining to the earthquake event on March 31, 2002 (Richter scale of 6.8) in the Niu-Dou region of Sansing Township were used in this study. The design parameters were Ss D = 0.8 and S1 D = 0.45. The ground motion record was selected from station ILA025. In the experiment, the original time history for east-west (PGA = 90.74 Gal) and southnorth (PGA = 118.62 Gal) directions was assembled into a new ground acceleration. Subsequently, an artifi cial time history compatible with the design response spectrum was created. Considering the total duration of the original record was relatively long, and the time limitation of the on-site operation and system stability, only the main 40 s vibration record was adopted as the input ground acceleration for the experiment. |
| P3 | 牛鬥橋現地實驗-P3橋墩 | In-Situ Test of Niu-Dou Bridge, Column P3 | NCREE | Field | Cyclical loading test | RC | P3橋柱現況基礎裸露深度為1.2公尺,所受沖刷影響較為輕微,屬一般橋梁中為數較多的情況,故歸類為本試驗之標竿試體;P4橋柱現況基礎裸露深度為2.8公尺,為求確切反應沖刷對橋柱耐震能力的影響,並兼顧試驗的安全性,於基礎底部再額外開挖至總裸露深度為4公尺,即1/3沉箱深度,以做為本試驗之沖刷試體。而P3及P4橋柱將先各別進行反覆載重試驗至側位移比3%,再施以單向側推試驗至油壓制動器之最大衝程(約5%側移角)。 | This study employed a cyclic loading experiment as the primary test for Columns P3 and P4, and the loading protocol was conducted at drift ratios of 0.25%, 0.375%, 0.5%, 0.75%, 1.0%, 1.5%, 2.0%, and 3.0%. Two cycles were performed at each drift angle. Considering the limitations to the stroke of the actuator, cyclic loading was pulled to 3% drift before it was further pushed to a drift of 5%. Prior to the single-cycle pushover test, a pseudo-dynamic test was conducted on Column P2. An artifi cial time-history compatible with the design response spectrum according to the seismic design specifi cation for highway bridges (MOTC, 2009) was developed. Because the Niu-Dou Bridge was situated in Yilan County, the data pertaining to the earthquake event on March 31, 2002 (Richter scale of 6.8) in the Niu-Dou region of Sansing Township were used in this study. The design parameters were Ss D = 0.8 and S1 D = 0.45. The ground motion record was selected from station ILA025. In the experiment, the original time history for east-west (PGA = 90.74 Gal) and southnorth (PGA = 118.62 Gal) directions was assembled into a new ground acceleration. Subsequently, an artifi cial time history compatible with the design response spectrum was created. Considering the total duration of the original record was relatively long, and the time limitation of the on-site operation and system stability, only the main 40 s vibration record was adopted as the input ground acceleration for the experiment. |
| P4 | 牛鬥橋現地實驗-P4橋墩 | In-Situ Test of Niu-Dou Bridge, Column P4 | NCREE | Field | Cyclical loading test | RC | P3橋柱現況基礎裸露深度為1.2公尺,所受沖刷影響較為輕微,屬一般橋梁中為數較多的情況,故歸類為本試驗之標竿試體;P4橋柱現況基礎裸露深度為2.8公尺,為求確切反應沖刷對橋柱耐震能力的影響,並兼顧試驗的安全性,於基礎底部再額外開挖至總裸露深度為4公尺,即1/3沉箱深度,以做為本試驗之沖刷試體。而P3及P4橋柱將先各別進行反覆載重試驗至側位移比3%,再施以單向側推試驗至油壓制動器之最大衝程(約5%側移角)。 | This study employed a cyclic loading experiment as the primary test for Columns P3 and P4, and the loading protocol was conducted at drift ratios of 0.25%, 0.375%, 0.5%, 0.75%, 1.0%, 1.5%, 2.0%, and 3.0%. Two cycles were performed at each drift angle. Considering the limitations to the stroke of the actuator, cyclic loading was pulled to 3% drift before it was further pushed to a drift of 5%. Prior to the single-cycle pushover test, a pseudo-dynamic test was conducted on Column P2. An artifi cial time-history compatible with the design response spectrum according to the seismic design specifi cation for highway bridges (MOTC, 2009) was developed. Because the Niu-Dou Bridge was situated in Yilan County, the data pertaining to the earthquake event on March 31, 2002 (Richter scale of 6.8) in the Niu-Dou region of Sansing Township were used in this study. The design parameters were Ss D = 0.8 and S1 D = 0.45. The ground motion record was selected from station ILA025. In the experiment, the original time history for east-west (PGA = 90.74 Gal) and southnorth (PGA = 118.62 Gal) directions was assembled into a new ground acceleration. Subsequently, an artifi cial time history compatible with the design response spectrum was created. Considering the total duration of the original record was relatively long, and the time limitation of the on-site operation and system stability, only the main 40 s vibration record was adopted as the input ground acceleration for the experiment. |